
116 N Edwards Ferry Rd NE,
Leesburg, VA 20176
P: 703-737-0400
F: 703-737-0440
email@b2epc.com
116 N Edwards Ferry Rd NE, |
Federal Projects
Naval Air Station - Bachelor Enlisted Quarters, Gymnasium, and Dining HallEnergy conservation and life-cycle cost analysis and preliminary design for the new building complex, including central heating and cooling plants, 100% dedicated outside air heat recovery ventilation systems, central domestic hot water storage and heating systems Anacostia, DC U.S. GSA - General Services Administration2-year open-end contract for professional A/E services 1995-1997 and 5-year open end contract for professional A/E services 1998-2003 Washington, DC U.S. White House - East WingHVAC upgrade and architectural renovation. Total system renovation and construction phasing plan Washington, DC Social Security Administration - HeadquartersMechanical and Electrical redesign of 800,000 SF administrative, data processing, and records center for the SSA Baltimore, MD -- Floor Size: 800000 SF U.S. Capitol BuildingPlumbing survey and total system upgrade. All drawings developed on AutoCAD from hand survey (w/o existing plumbing drawings). Complete construction phasing and construction documents for the 250,000 SF building Washington, DC -- Floor Size: 250000 SF U.S. Tax Court760 ton chilled water plant and EMS digital control system for the 250,000 SF building including major architectural and structural work. Concept work included approval from the Commission of Fine Arts and the National Capitol Planning Commission Washington, DC -- Floor Size: 250000 SF 1724 F. StreetEnergy Audit/Analysis and Feasibility Study for the 50,000 SF office building, including energy efficient lighting, window and HVAC systems Washington, DC -- Floor Size: 50000 SF Roosevelt Building - FB9Energy Audit/Analysis and Feasibility Study for the 750,000 SF office building, including 3,000 ton chiller plant, energy efficient lighting retrofit, daylighting controls, conversion to natural gas domestic hot water heating and energy efficient motor replacement Washington, DC -- Floor Size: 750000 SF Dept. of Defense - Navy AnnexEnergy Audit/Analysis, Feasibility Study and preliminary design for the 1,090,000 SF office building, including both pneumatic and direct digital (DDC) energy management and control system (EMCS) retrofit Arlington, VA -- Floor Size: 1090000 SF Dept. of Defense - PentagonEnergy Audit/Analysis, Feasibility Study and preliminary design for the 5,000,000 SF office building, (4/5 of total area), including both pneumatic and direct digital (DDC) energy management and control system (EMCS) retrofit Arlington, VA -- Floor Size: 5000000 SF Naval Air Station - Naval Aviation Systems Team ComplexEnergy study for the 450,000 SF office building, including electrically driven centrifugal chilled water plant, gas-fired absorption chilled water plant and hydronic heat pumps Patuxent, MD -- Floor Size: 450000 SF Naval Air Station - Propulsion System Evaluation FacilityEnergy Study for the 77,000 SF laboratory building, including gas-fired furnace heating and DX cooling rooftop air handling units and heat recovery laboratory ventilation systems Patuxent, MD -- Floor Size: 77000 SF Walter Reed - Army Medical CenterFeasibility study for electrical demand peak shaving/shifting of the 7,000 ton chilled water plant Washington, DC -- Floor Size: 7000 SF Walter Reed - Army Medical CenterHVAC system upgrade of the army chapel for the DX cooling and central steam heating system. Work included asbestos abatement Washington, DC FDA Animal LabsMechanical and electrical total system upgrade for the 60,000 SF facility. Work included system design for Biohazard Level 3 laboratories Bethesda, MD -- Floor Size: 60000 SF Cannon - House of Representatives - Office BuildingPlumbing survey and documentation of existing sanitary, storm, domestic water, and drinking water systems. Evaluation of all systems, redesign recommendations. Complete construction phasing, coordination and cost estimates for historically significant building Washington, DC Russell-Senate Office BuildingPlumbing survey and documentation of existing sanitary, storm, domestic water, and drinking water systems. Evaluation of all systems, redesign recommendations. Complete construction phasing, coordination and cost estimates for historically significant building Washington, DC Dulles Intl. Airport - Marriott InFlight KitchenM/E Design for kitchen facility, including sanitary, storm, domestic water, gas systems and fire protection systems. Complete construction phasing, field services, and construction documents for large InFlight meal prep kitchen Chantilly, VA Dulles Intl. Airport - Marriott Restaurant facilitiesM/ E Design for kitchen and snack bar facilities throughout main terminal, including sanitary, storm, domestic water, gas systems and fire protection systems. Complete construction phasing, field services, and construction documents for all facilities Chantilly, VA Army Research Lab.Clean room laboratory programming, site investigation, as built drawings, and design for the high tech research laboratories. Design included, toxic gas, toxic exhaust, acid waste, solvent waste, corrosive exhaust, general exhaust, gas detection, tool fit-up, sprinkler, fire alarm, air handling and filtration systems and electrical distribution for the Class 100, Class 1000, and Class 10000 clean rooms Aldelphi, MD Naval Facility - Engineering CommandSolvent processing facility with Class 1, Division 1 explosion proof devices. Solvent spill and containment design, with non-conductive materials for the 10,000 SF operations area Indian Head, MD -- Floor Size: 10000 SF PentagonOperation and Maintenance manuals for the telecommunications center uninterruptible power supply and air- conditioning Arlington, VA Walter Reed - Army Medical CenterMechanical and electrical system design for the 4,700 SF computer center Washington, DC -- Floor Size: 4700 SF CIAMechanical and electrical system design for the 3,000 SF computer center Vienna, VA -- Floor Size: 3000 SF NASA - Space Station Freedom HeadquartersMechanical and Electrical design for administrative and computer center serving the space station effort. Work included satellite offices for the European, Japanese, and Canadian space organization Reston, VA Fort Belvoir - Indefinite Quantity ContractMEP Consultant for a 3-year indefinite quantity contract with US Army Corps of Engineers (2002 - 2005.) Chantilly, VA Fort Belvoir - Building 184Prime consultants for design of a conference center for the Defense System Management College. Fort Belvoir, VA -- Floor Size: 5000 SF Fort Belvoir - Building 202MEP Consultant for a new office building addition. Fort Belvoir, VA -- Floor Size: 6000 SF Fort Belvoir - Building 226MEP Consultant for additions and alterations to the training/seminar building for the Defense System Management College. Fort Belvoir, VA -- Floor Size: 30000 SF |