
116 N Edwards Ferry Rd NE,
Leesburg, VA 20176
P: 703-737-0400
F: 703-737-0440
email@b2epc.com
116 N Edwards Ferry Rd NE, |
Office Building Projects
Shimizu America, Inc.Mechanical HVAC design for the 20,000 SF high-tech office building Front Royal, VA -- Floor Size: 20000 SF U.S. GSA - General Services Administration2-year open-end contract for professional A/E services 1995-1997 and 5-year open end contract for professional A/E services 1998-2003 Washington, DC U.S. White House - East WingHVAC upgrade and architectural renovation. Total system renovation and construction phasing plan Washington, DC Social Security Administration - HeadquartersMechanical and Electrical redesign of 800,000 SF administrative, data processing, and records center for the SSA Baltimore, MD -- Floor Size: 800000 SF U.S. Capitol BuildingPlumbing survey and total system upgrade. All drawings developed on AutoCAD from hand survey (w/o existing plumbing drawings). Complete construction phasing and construction documents for the 250,000 SF building Washington, DC -- Floor Size: 250000 SF 800 Connecticut AvenueMechanical, electrical and fire protection design for the 110,000 SF office building and 4-story underground garage, including high-rise fire alarm system. All work performed in accordance with ADA requirements Washington, DC -- Floor Size: 110000 SF U.S. Tax Court760 ton chilled water plant and EMS digital control system for the 250,000 SF building including major architectural and structural work. Concept work included approval from the Commission of Fine Arts and the National Capitol Planning Commission Washington, DC -- Floor Size: 250000 SF 1724 F. StreetEnergy Audit/Analysis and Feasibility Study for the 50,000 SF office building, including energy efficient lighting, window and HVAC systems Washington, DC -- Floor Size: 50000 SF Roosevelt Building - FB9Energy Audit/Analysis and Feasibility Study for the 750,000 SF office building, including 3,000 ton chiller plant, energy efficient lighting retrofit, daylighting controls, conversion to natural gas domestic hot water heating and energy efficient motor replacement Washington, DC -- Floor Size: 750000 SF Shady Grove - Office CenterMechanical, electrical and fire protection and alarm design for the 210,000 SF building. All work performed in accordance with ADA requirements Shady Grove, MD -- Floor Size: 210000 SF Am. College of RadiologySurvey, building review, and written recommendations for renovation and expansion of existing 50,000 SF professional headquarters. Design initiated to renovate existing facility and add 50,000 SF building and 90,000 SF parking garage Reston, VA -- Floor Size: 190000 SF Dept. of Defense - Navy AnnexEnergy Audit/Analysis, Feasibility Study and preliminary design for the 1,090,000 SF office building, including both pneumatic and direct digital (DDC) energy management and control system (EMCS) retrofit Arlington, VA -- Floor Size: 1090000 SF Dept. of Defense - PentagonEnergy Audit/Analysis, Feasibility Study and preliminary design for the 5,000,000 SF office building, (4/5 of total area), including both pneumatic and direct digital (DDC) energy management and control system (EMCS) retrofit Arlington, VA -- Floor Size: 5000000 SF Naval Air Station - Naval Aviation Systems Team ComplexEnergy study for the 450,000 SF office building, including electrically driven centrifugal chilled water plant, gas-fired absorption chilled water plant and hydronic heat pumps Patuxent, MD -- Floor Size: 450000 SF Naval Air Station - Propulsion System Evaluation FacilityEnergy Study for the 77,000 SF laboratory building, including gas-fired furnace heating and DX cooling rooftop air handling units and heat recovery laboratory ventilation systems Patuxent, MD -- Floor Size: 77000 SF Loudoun County - Government CenterHVAC system plan review for the 165,000 SF office building, including rooftop VAV units totaling 400 Tons Loudoun County, VA -- Floor Size: 165000 SF Loudoun County - School Board Administration BuildingMechanical, Electrical, Plumbing, Fire Protection design for the 200,000 SF office building including energy recovery technology Loudoun County, VA -- Floor Size: 200000 SF Fort Belvoir - Building 202MEP Consultant for a new office building addition. Fort Belvoir, VA -- Floor Size: 6000 SF Fort Belvoir - Building 226MEP Consultant for additions and alterations to the training/seminar building for the Defense System Management College. Fort Belvoir, VA -- Floor Size: 30000 SF World BankDesign of new solar energy photovoltaic electrical system to power the existing lighting, including complete reroofing project. Building H Data Center upgrade, including installation of new, paralleling gear, and fuel cells. The fuel cells drive the data center, the waste heat from the fuel cells heats the office building in winter, and heats domestic hot water all year long. The paralleling gear runs the fuel cells, solar panels, and standby generators with the electric utility. In addition, they allow the load curtailment program to continue to operate. Washington, DC |