BUILDING EFFICIENT FEATURES
- Improved Lighting and Controls Design
- Primary Variable Flow Geo-Thermal Plant
- Geo-Thermal Heat Pump System
- DHW Thermal Storage
- VRF Geo-Thermal Heat Pumps for Admin. Are
- Energy Recovery Ventilation
- Above Ground Valve House
- PV Array (10 kW)
- Energy Efficient Variable Flow Fans
- Energy Efficient Variable Flow Pumps
- Daylight Harvesting
- LED Interior Lighting
- LED Exterior Lighting
- Green Touch Screen
- EMS Control Strategies (for energy savings)
Paint Branch High School
Montgomery County, MD
370,000 square foot School
~36% More efficient than ASHRAE 90.1 – 200
LEED SILVER (Version NC 2.2)
~36% More efficient than ASHRAE 90.1 – 200
LEED SILVER (Version NC 2.2)